ECN Magazine highlighted the 2 megawatt, 24-acre solar photovoltaic array that is being constructed at the Dugway Proving Ground (DPG) site in Dugway, Utah. This new system will allow DPG’s existing electrical grid to produce 4 million kilowatt-hours of energy per year. Tetra Tech and joint venture partner TriEco are serving as the prime contractor for the design and build of the array. DPG is executing this project to optimize efficiency and conserve natural resources through on-site renewable energy generation and to support their objective of meeting renewable energy goals. This is the first of many prospective renewable energy projects to support to the U.S. Army Corps of Engineers (USACE) renewable energy goals.